Milton Keynes – New Courtyard Pathways
Project Description
This project began with the careful removal of the existing tarmac and pathway. The operatives then dug down to create space for the new tiles to be placed and levelled to ensure there was sufficient space for the tiles and concrete to secure them in place and mitigate trip hazards.